BC Fishing Reports banner

1 - 1 of 1 Posts

·
Registered
Joined
·
36 Posts
Discussion Starter #1
The Canadian Environmental Assessment Agency has determined that a federal environmental assessment is required for the proposed Coastal GasLink Pipeline Project in British Columbia (B.C.). Coastal GasLink Pipeline Ltd. is proposing the construction and operation of an approximately 650 km pipeline to deliver natural gas from Groundbirch (40 km west of Dawson Creek, B.C.) to a proposed liquefied natural gas (LNG) facility near Kitimat, B.C.


The Agency invites the public to comment on which aspects of the environment may be affected by this project and what should be examined during the environmental assessment.


The public can review and comment on the draft Environmental Impact Statement (EIS) Guidelines, a document that identifies the potential environmental effects to be taken into consideration and the information and analysis that needs to be included in the proponent's EIS.


Please click on the link in the message below for a map of the route and more details on the project and how to comment. The deadline for comments is January 30.


http://www.ceaa-acee.gc.ca/050/document-eng.cfm?document=84264


Link to the SSBC submission:


http://www.steelheadsociety.org/sites/default/files/January 24 2013 Gaslink submission.pdf
 
1 - 1 of 1 Posts
Top